In collaboration with the project designer, TDS can produce electronic models and layout drawings for conceptional, preliminary or construction purposes. This approach can minimize or delete steel detailing lead-time. |
 |
Pre-detailing of steel structures for the owner or consultant prior to or during the tender process. This approach will minimize or delete steel detailing lead-time. |
 |
Conventional steel detailing for steel fabricators following clients sequencing in order to satisfy shop and site schedule requirements. |
 |
Produce electronic lists of project materials known as Preliminary Materials List, Advance Bill of Material or Reserve Bill. These lists are arranged by section sizes and can be exported in to fabrication management software for optimizing, tracking etc. |
 |
All TDS steel detail drawings come with a CNC link for automated cutting and drilling. |
 |
Finished detailing projects include the following drawings and reports:
- Drawing Register
- Cutting List
- Shop Bolt Summary
- Field Bolt Summary
- Field Bolt Location List
- Fabrication Drawings
- Fitting Drawings
- Erection Drawings
- ISO Drawings
|